In-flight rest
Plan crew rest on long flights and check it against EASA limits.
- RouteFrom, to, departure
- CrewPilots and rest facility
- PlanRest slots and EASA check
Roster duty rest
Scheduled gaps between report and release; not a compliance assessment.
Calculator
LIS MFM · 10,994 km ⓘ
UTC 24/11/2026 22:30 · LIS 24/11/2026 22:30 · MFM 25/11/2026 06:30
Adjust
Editable defaults — not regulation
Rest window 09:35
At controls Rest LandingRules & help
Scheduled/charter CAT aeroplanes, augmented crew. Every pilot must rest. ORO.FTL.205(e) · FAQ 47619
TOC: top of climb. TOD: top of descent. Shading = usable window. Blue = at controls; green/amber = rest; grey = available. Gaps between rests = handover.
Final sector: enter the report time for the entire duty.
Flat surface ≥80°; separate from cabin and flight deck; light control and noise isolation.
CS FTL.1.205(c) facilitiesSeat ≥45°; pitch ≥55 in / 137.5 cm; width ≥20 in / 50 cm; leg/foot support; curtain and disturbance protection.
CS FTL.1.205(c) facilitiesSeat ≥40°; leg/foot support; curtain; no adjacent occupied passenger seat.
CS FTL.1.205(c) facilities| Pilots | Class 1 | Class 2 | Class 3 |
|---|---|---|---|
| 3 | 16:00 | 15:00 | 14:00 |
| 4 | 17:00 | 16:00 | 15:00 |
- 90 min · Landing: 120 min · CS FTL.1.205(c)(1)(ii)
- Maximum 3 sectors · CS FTL.1.205(c)(1)(i)
- EASA: flight time includes taxi (continuous block). · ORO.FTL.105(13)
- +1 h: continuous block >9 h · up to 2 sectors · CS FTL.1.205(c)(4)
- FDP: Total · CS FTL.1.205(c)(5)
- Destination: greater of 14 h or preceding duty (including post-flight). · CS FTL.1.205(c)(6)
- Positioning incompatible with this extension · CS FTL.1.205(c)(7)
- Operator policy · Editable defaults — not regulation · GM1 CS FTL.1.205(c)(1)(ii) · GM2
Cabin crew · information only
| FDP | Class 1 | Class 2 | Class 3 |
|---|---|---|---|
| ≤14:30 | 01:30 | 01:30 | 01:30 |
| ≤15:00 | 01:45 | 02:00 | 02:20 |
| ≤15:30 | 02:00 | 02:20 | 02:40 |
| ≤16:00 | 02:15 | 02:40 | 03:00 |
| ≤16:30 | 02:35 | 03:00 | Not allowed |
| ≤17:00 | 03:00 | 03:25 | Not allowed |
| ≤17:30 | 03:25 | Not allowed | Not allowed |
| ≤18:00 | 03:50 | Not allowed | Not allowed |
ICAO Annex 6 / Doc 9966: fatigue management. An approved FRMS may specify different values. ICAO
CS FTL.1 · Issue 1 Amendment 1Planning aid · EASA CS FTL.1 baseline. The operator’s approved FTL scheme / OM-A prevails. Qualified relief required; qualifications, cumulative limits and the entire duty are not checked.